Follow

@_1751015 @strypey

I've read that load following was part of design of any plant built since 90's as intermittent sources were expected to be added to the grid. It was rarely used because it's most economically efficient to use NPP at 100% capacity and load following was much cheaper done plants that actually use fuel like gas or coal. But if there was no gas or coal, it could be done with NPP too.