Follow

@nicksellen

Plus, as explained before, a single 500 MW gas/coal/nuclear power plant that occupies 0.3 km2 at most needs to be replaced by 2'500 hectares (25 km2) of solar panels which will anyway work around 15% of the time on average in Europe. So PV actually scales very poorly.